Sistema de Protección NRBQ para tanqueta antidisturbios

Contratista:
Cliente:
Fecha de ejecución: 2007

Desempeño

Customer Requirements Analysis and Technical Solution Design
Preparation of the offer and commercial follow-up during the execution of the project.
Project Management until final client acceptance


Descripción

Specific design and development of a CBRN air filtration system and its subsequent integration into the I.P.V. anti-riot armored vehicle
The development of the project contemplated the design and integration of the following elements:



  • Fun system and air filter unit

  • Clean/Dirty Air Duct System

  • CBRN Filter Unit Management and Control System

  • Electrical and mechanical integration in the vehicle housing