Blast Relief panels for High Power Electric Stations

Contractor:
Client:
Release date: 2005-2015

Responsibility

Analysis of customer requirements and conceptual development of the technical solution
Monitoring, test, validation and Certification of the proposed solution (Patent of utility model)
Preparation of offers and commercial follow-up during projects execution


Scope

Mechanical design of Venting Panels and Blast Doors according to the characteristics of each high voltage armored substation
Prototype testing, Validation and Certification (SGS)
Installation at site, testing and acceptance


Capabilities

Armored mechanical device designed and rated to allow the controlled relief of an overpressure wave without transmitting stresses to the walls and avoiding mechanical disintegration
Deployment in High Voltage Shielded Transformation Stations located in Populations
Withstanding pressure waves up to 2 Bar without suffering deformation
Fire resistance level RF60